Seabridge Gold

Order by titleOrder by Date

News & Reports: NEWS

VIEW ALL TIMELY DISCLOSURE DOCUMENTS: IN CANADA AT SEDAR AND IN U.S.A. AT EDGAR


Seabridge Gold Files Year End Audited Financial Statements and MD&A
Friday, 26th March 2010

Toronto, Canada...Seabridge Gold announced today that it has filed its Audited Consolidated Financial Statements and its Management's Discussion and Analysis for the year ended December 31, 2009 on SEDAR (www.sedar.com). To review these documents on the Company website, please see http://www.seabridgegold.net/2009-Q4.pdf.

Read More  


Preliminary Feasibility Study Completed for Seabridge Gold’s KSM Project
Wednesday, 31st March 2010

Study Reports Reserves of 30.2 Million Ounces of Gold, 7.0 Billion Pounds of Copper, 133 Million Ounces of Silver and 210 Million Pounds of Molybdenum

Base Case Life of Mine Cash Operating Costs Estimated at $144 per Ounce of Gold Produced (Net of Base Metal Credits)

Toronto, Canada - Seabridge Gold Inc. announced today results from a National Instrument 43-101 compliant Preliminary Feasibility Study ("PFS") of its 100% owned KSM project located in northern British Columbia, Canada. The PFS was prepared by Wardrop, a Tetra Tech Company (Wardrop). The Executive Summary from the PFS can be found at www.seabridgegold.net/KSM-PFS.pdf. The complete PFS will be filed on SEDAR at www.sedar.com within 45 days.

Read More  


Seabridge Gold Announces 2010 Program for Courageous Lake
Tuesday, 6th April 2010

Toronto, Canada - Seabridge Gold Inc. announced today that it plans to spend approximately $15 million this year to advance its 100% owned Courageous Lake gold project towards a National Instrument 43-101 compliant Preliminary Feasibility Study. The main objective of the program is to conduct further diamond drilling designed to upgrade a substantial portion of the existing inferred resource at the project to the measured and indicated resource categories.

Read More  


Seabridge Gold Announces 2010 Program for KSM
Monday, 19th April 2010

Toronto, Canada - Seabridge Gold Inc. announced today that it plans to spend approximately $17.5 million this year to advance its 100% owned KSM project. The main initiatives are: (i) drilling for a potential increase in reserves; (ii) exploring for additional resources at the new Iron Cap zone; (iii) continuing optimization work on the project's Preliminary Feasibility Study ("PFS") and (iv) preparing an Environmental Assessment Application ("EAA") and engaging Aboriginal Peoples on project development.

Read More  


Seabridge Gold Files First Quarter 2010 Financial Statements and MD&A
43-101 Preliminary Feasibility Study for KSM Filed on SEDAR

Friday, 14th May 2010

Toronto, Canada - Seabridge Gold announced today that it has filed its First Quarter Financial Statements and Management's Discussion and Analysis for the three month period ended March 31, 2010 on SEDAR. To review these documents on the Company website, please see http://www.seabridgegold.net/2010-Q1-Report.pdf.

Read More  


Drilling Commences at Seabridge Gold’s KSM Project
Wednesday, 26th May 2010

Toronto, Canada - Seabridge Gold Inc. announced today that drilling is now underway at its 100% owned KSM project. As previously announced in the news release of April 19, 2010, this year's drill program is designed to (i) convert more of the existing mineral resources to proven and probable reserves, and (ii) conduct resource definition drilling at the Iron Cap zone where drilling by previous operators identified the potential for a fourth large deposit at KSM. Drilling to be conducted at the Mitchell and Sulphurets during 2010 is expected to increase reserves by 2 to 3 million ounces of gold. At Iron Cap, Seabridge's geologists believe that this new zone has the potential to host 250 to 500 million tonnes of mineralized material at grades similar to the Mitchell zone.

Read More  


Permitting Progresses at Seabridge Gold’s KSM Project
Public Input Commences on Proposed Environmental Assessment Scope

Wednesday, 9th June 2010

Toronto, Canada - Seabridge Gold reports that the environmental permitting process for its 100% owned KSM Project in northern British Columbia (BC) is proceeding on schedule.  The Canadian Environmental Assessment Agency (CEAA) has released its "Proposed Scope of the Environmental Assessment" document and invited the public to submit comments over a 30 day period. This document identifies the components of the proposed KSM Project and the scope of the environmental assessment required to address the "comprehensive study regulations" as listed in the Canadian Environment Assessment Act.

Read More  


KSM Video
Monday, 14th June 2010

Read More  


Drilling Underway at Seabridge’s Courageous Lake Gold Project
Wednesday, 16th June 2010

Toronto, Canada - Seabridge Gold Inc. announced today that drilling is now underway at its 100% owned Courageous Lake gold project. The main objective of the 2010 drill program is to upgrade a substantial portion of the existing inferred resource to the measured and indicated resource categories. The 2010 program also includes environmental and permitting work, metallurgical research and geotechnical drilling.

Read More  


Seabridge drilling confirms Iron Cap as major new gold-copper deposit
New fourth KSM zone could significantly improve project economics

Monday, 26th July 2010

Toronto, Canada - Results from the first eight holes drilled by Seabridge at the Iron Cap target have confirmed a new, large potentially bulk minable deposit at KSM which could substantially improve project economics. Results to date include wide intercepts of gold, copper and silver grades above the KSM average. Infill drilling will now proceed at Iron Cap with the aim of establishing new proven and probable reserves to be included in mine plans for the project.

Read More